Toronto, Ontario — June 18, 2026 — Leads & Copy — STLLR Gold Inc. has announced significant additional assay results from its 2026 drilling program at the Jonpol Deposit, located within the Garrison Property of the Tower Gold Project in Ontario’s Timmins Mining Camp. The results highlight high-grade, near-surface gold mineralization, reinforcing the deposit’s potential to drive value for the overall project.
Key findings include hole MGA26-268, which delivered substantial metal factors at Jonpol. This hole returned 13.00 grams per tonne of gold (uncut) over 22.75 metres, including a higher-grade interval of 29.09 g/t Au uncut over 9.91 metres. Another notable intersection came from hole MGA26-266, reporting 3.01 g/t Au uncut over 22.93 metres, with an internal zone of 11.95 g/t Au uncut over 4.80 metres.
These assay results are contributing to increased confidence in Jonpol’s potential for an open-pit strike extension, which could extend to approximately 1,200 meters from the current 400 meters defined in the Tower Preliminary Economic Assessment (Tower PEA). The company anticipates these findings could significantly enhance the Tower Gold Project’s production profile and overall economics.
The Jonpol Deposit is strategically situated at the eastern end of the Tower property, along the Munro Fault, a splay of the Destor-Porcupine Fault Zone. The mineralization is found within structurally controlled alteration zones in mafic to ultramafic rocks, with gold mineralization closely associated with felsic intrusive rocks.
STLLR Gold has completed 8,536 meters of drilling at Jonpol as part of its first-half 2026 program, with assays still pending for several holes. The company is currently developing drilling plans for the remainder of 2026, focusing on two main objectives: strike extension and infill drilling to de-risk the project. The strike extension targets aim to expand the mineralization from 400 meters to approximately 1,200 meters, with Jonpol remaining open along strike and at depth. The infill drilling is designed to confirm the block model and support the potential expansion of higher-grade mineralization for inclusion in the Tower Mineral Resource Estimate (Tower MRE).
The recently reported assays continue to intersect near-surface, high-grade mineralization, with grades in targeted areas along the western strike extension frequently exceeding the current average open-pit grades at Jonpol as defined in the Tower MRE. These results support the current geological model and suggest the potential for significant mineral resource expansion.
Quality control procedures include the use of independent certified reference materials, blanks, routine pulp repeats, and third-party check assays to ensure data integrity. True thickness was calculated using Leapfrog Geo, and all intercepts were calculated using a 0.30 g/t Au cut-off, a maximum of 5 meters of internal dilution, and a 25 g/t Au cap.
John McBride, Vice President of Exploration for STLLR, P.Geo., has reviewed and approved the technical disclosure in this news release as the Qualified Person under NI 43-101.
STLLR Gold Inc. is a Canadian gold development company focused on advancing high-potential gold projects in Canada, including the Tower Gold Project and the Hollinger Tailings Project in Ontario, and the Colomac Gold Project in the Northwest Territories. The company’s experienced management team aims to rapidly advance these projects.
Source: STLLR Gold Inc.