VANCOUVER, British Columbia — January 22, 2026 — Leads & Copy — Mirasol Resources Ltd. is drilling at its 100%-owned Sobek Copper-Gold-Silver Project in Chile’s Vicuña District. The 46 South target, 7 km west of Filo del Sol, sits at the south end of the Sobek Central corridor.
The Deep Vectoring IP and MT geophysical survey results have defined a shallow IP anomaly with strong MT-resistivity and chargeability responses, interpreted as a High Sulphidation Epithermal (HSE) target, underlain by a magnetic anomaly.
According to Mirasol’s President and CEO Tim Heenan, the geophysical survey results, combined with previous data, reinforce the potential for 46 South to represent a significant mineralized system. He notes that the survey has strengthened the shallow HSE portion of the target, which starts at just 200m below surface, and will be the primary focus of this maiden drill hole.
The drilling strategy will prioritize the IP 10–20 mV/V range chargeability corridor adjacent to the resistive core. The planned drillhole has a projected depth of approximately 1000m and aims to test structural intersections and the resistive core and sulphide halo at depth, adjacent to the magnetic anomaly.
The 46 South target lies at the southern end of a 3-km N-S trending corridor hosting alteration and mineralization that runs parallel to Filo del Sol, which is only ~7 km to the east. It is located on the southern margin of a district-scale magnetic high where airborne surveys outlined distinct cylindrical anomalies. A soil survey outlined a copper-gold-moly geochemical anomaly on surface that overlays IP-PDP responses. Tourmaline breccias and hydrothermal breccias were also identified.
A Deep Vectoring IP and MT geophysical survey was completed to resolve the geometry of the IP/Res domains and MT responses. The survey refined the characterization of the resistive/chargeable domains and the deeper MAG response.
The integration of Vector IP with ground MT, PDP/IP, airborne/ground magnetics, and existing geology/alteration mapping has increased the ranking of the shallow HSE target located approximately 200m below surface and which extends to over 500m depth. This compilation has revealed a coherent resistive core, interpreted as representing a silica-rich High Sulphidation Epithermal (HSE) core.
The Vector IP chargeability has also outlined a structurally controlled sulphide halo, including a “chargeability neck” spatially associated with the NW structural corridor, supporting the interpretation of a feeder-style architecture. Geochemical vectoring has defined two domains (structural blocks) separated by the NW structural orientation: the southern domain showing the strongest Copper-Gold-Moly soil footprint, and the northern domain associated with the tourmaline breccia’s and a distinct geophysical character.
Mirasol staked the Sobek Project in 2016. The consolidated Sobek Project is located on the same regional N-S trending structural corridor and just 7km to the west of the Filo del Sol deposit and 3km to the southwest of NGEx Mineral’s discovery at Lunahuasi.
Sobek is located within a prospective geological environment with a mineralized structural corridor crosscut by a deep-seated trans-cordilleran lineament.
For further information, contact: Tim Heenan, President & CEO or Troy Shultz, Vice President Investor Relations, Tel: +1 (604) 602-9989, Email: contact@mirasolresources.com
Qualified Person Statement: Mirasol’s disclosure of technical and scientific information in this press release has been reviewed and approved by Tim Heenan (MAIG).
Source: Mirasol Resources Ltd.