Japan Gold (TSXV:JG) Intersects Gold Mineralization at Mizobe Project

Vancouver, British Columbia — January 22, 2026 — Leads & Copy — Japan Gold Corp. has announced encouraging results from its Mizobe Project, including the first intercept of a banded chalcedony vein. The company completed two diamond drill holes totaling 1,156 meters at the Mizobe Project, located in the Hokusatsu district of southern Kyushu, Japan, approximately 23 kilometers south of the Hishikari Mine, operated by Sumitomo Metal Mining Co., Ltd.

The drill program, designed to test for the presence and potential continuity of mineralization beneath mineralization intersected in historical drill holes MZDD23-003 and MZDD23-004, has intersected zones of hydrothermal alteration associated with anomalous gold, arsenic, and antimony beneath post-mineral cover.

Key highlights from the drill results include:

  • 1.82g/t Au over 1.50m (Drill hole: MZD25-008), from 292.50m (including 3.53g/t Au over 0.50m from 293.0m). Gold mineralization is associated with sulphide mineralization, silicification, and hydrothermal brecciation, accompanied by anomalous arsenic and antimony.
  • 1.07g/t Au over 2.0m (Drill hole: MZD25-009), from 116.30m
  • 1.11g/t Au over 1.35m (Drill hole: MZD25-009), from 189.95m

Drill hole MZD25-009 intersected similar mineralization at approximately 116.30m downhole and encountered a banded chalcedony vein at approximately 190.75m. This vein is discontinuous over an interval of approximately 2.40m and represents the first documented drill intersection of this vein style at the Mizobe Project. This vein style is common of low-sulphidation epithermal environments and may be indicative of the upper levels of a hydrothermal system.

Historical drilling completed in 2023 at the Mizobe Project under the Barrick Alliance intersected gold mineralization beneath post-mineral cover. Notable historic intercepts include 10.0m at 4.27g/t Au from 122.75m (MZDD23-003) and 4.0m at 1.60g/t Au from 36.5m (MZDD23-004).

Based on current drilling, the alteration has been observed in multiple drill holes and appears to be controlled by the rock type and is best developed in the upper portions of the drill holes. All reported intervals are downhole core lengths; true widths have not yet been determined. Complete assay results are presented in Table 1.

Japan Gold is encouraged by the presence of hydrothermal alteration, along with associated anomalous metals and pathfinder elements identified to date. Future exploration will focus on further delineating the extent of the alteration system, improving the understanding of the source and controls of the alteration and associated geochemical anomalies, and evaluating areas with potential for more strongly developed mineralization.

The drilling results discussed in this release are from drill core samples obtained by PQ, HQ and NQ-size triple-tube diamond core drilling using a PMC-700 drill rig owned and operated by the Company. The drilling program was fully supervised by Company senior geologists at the drilling site. The drill core was collected in plastic core trays at the drill site and transported by road in Company vehicles to its Kagoshima office and core processing facility near the project area. The drill core was carefully logged, photographed and sample intervals were marked up along predicted mineralized and unmineralized intervals along the entirety of the drill holes by Japan Gold senior project geologists.

Sample lengths varied from 0.3 to 2.0 metres, depending on the positions of geological contacts and variations in alteration composition. The core was split by a diamond rock saw supervised by project geologists. The half-core sample was collected from the entire length of each designated sample interval and placed into individual-labelled, self-sealing calico bags for secure packaging and transport to the laboratory. The half-core samples weighed between 0.4 to 6.16 kilograms depending on the sample length and core size. A chain of custody was established between the Company and the receiving laboratory to ensure the integrity of the samples during transportation from the site to the lab. The samples were sent in batches to ALS Laboratories in Vancouver, Canada for sample preparation and assaying.

Samples were crushed, pulverized and assayed for gold 50-gram charge Fire Assay / AAS Finish (Au-AA24; 0.005 ppm lower detection limit) and a 48 multi-element by 4-acid digest with ICP-MS determination (ME-MS61M; Ag 0.002 ppm lower detection limit). Over-limit Au and Ag samples were re-assayed by fire-assay and gravimetric finish (GRA-22, LDL of 0.5 and 5 ppm for Au and Ag respectively).

Certified Reference Materials (“CRMs”) were inserted by Japan Gold KK at every 20th sample to assess the repeatability and assaying precision of the laboratory. In addition, the laboratory applied its own internal Quality Control procedure that includes sample duplicates, blanks & geochemical standards. They report these results with the certified Assay Report. Laboratory procedures and QA/QC protocols adopted are considered appropriate. The CRMs and internal QA/QC results fall within acceptable levels of accuracy & precision and are considered to lack any bias.

Jason Letto, B.Sc., P.Geo., Japan Gold’s Vice President of Exploration, is the qualified person who reviewed and approved the technical information in this news release.

Alexia Helgason
Vice President, Corporate Communications
Phone: +1(604) 417-1265
Email: ahelgason@japangold.com

Source: Japan Gold Corp.

×

Welcome!

Smallcap Reporter is the source most up-to-date real-time, direct-from-source News Tips and Story Leads.

By Subscribing you will receive Daily Smallcap Update each day at 9:30 am ET (Market Open) in your inbox and you can unsubscribe any time.