Hertz Energy (CSE:HZ) Acquires Database for Lake George Antimony Mine

Vancouver, British Columbia — January 22, 2026 — Leads & Copy — Hertz Energy Inc. has acquired a comprehensive digital geological and technical database related to the historic Lake George Antimony Mine in south-central New Brunswick. The company plans to submit a bid to acquire the mine from the Province of New Brunswick. The Database consolidates decades of historical exploration, mining, and technical work completed at the mine.

The Lake George Antimony Mine, North America’s largest primary antimony producer, operated from the 1870s until 1996. The mine is currently under care and maintenance and owned by the Province of New Brunswick and is expected to be put up for tender in the coming months. Hertz Energy’s Lake George Antimony-Tungsten-Gold Project surrounds the past-producing mine.

The mine produced 20,220 tonnes of antimony from 1876 to 1990. Apocan Inc. re-opened the mine on November 5th, 1996, but operations were suspended in December 1996 due to a problem with the hoist and falling antimony prices.

The Database includes a 3D geological and mine model generated from digitized historical surface and underground level plans. The model incorporates 452 historical surface and underground drill holes. The Database contains all supporting files from the 2014 historical mineral resource estimate, comprising 2,467 assay intervals totaling 1,768 metres of sampled core from 452 historical diamond drill holes, representing a cumulative drilled length of 85,217 metres, along with compiled assay data from underground drilling.

Hertz Energy has acquired a recommended diamond drilling program designed to test the down-plunge extent of the principal mineralized zones. The Database includes historical geological reports, maps, and scientific publications related to the Lake George antimony and tungsten deposit.

The Company’s Tungmony Project’s scale and location provide optionality beyond the historic Lake George Mine and supports a long-term growth story rather than a single-asset thesis.

Kal Malhi, CEO of Hertz Energy, said the acquisition of the database is expected to significantly enhance Hertz Energy tender bid and reduce the time and cost required for Hertz Energy to evaluate the Project. The company plans to integrate the database into its internal geological and 3D modeling platform and utilize AI data compilation to refine geological interpretations, prioritize exploration targets, and design future drilling programs.

Hertz Energy intends to complete a thorough review and verification of the acquired database, including validation of historical drill hole, assay, and geological information by a Qualified Person(s). Concurrently, Hertz Energy will be executing an aggressive exploration program on its 100%-owned Lake George mineral claims that surround the Lake George Antimony Mine.

The Lake George Antimony-Tungsten-Gold Project is located approximately 30 kilometres southwest of Fredericton, New Brunswick. Hertz Energy Inc. acquired 93 mineral claims covering roughly 2,104 hectares in two contiguous blocks around the former mine site.

Mining at Lake George dates back to the late 1800s, with several phases of modern production between the 1970s and 1990s. Between 1972 and 1981, the operation produced approximately 34,000 tonnes of concentrate grading 65-66% antimony, while a subsequent phase from 1985 to 1990 mined roughly one million tonnes of mineralized material averaging about 4% Sb.

Hertz Energy is conducting a comprehensive data compilation and regional exploration program over its 100% owned mineral claims. Planned work includes geological mapping, prospecting, biochemical and soil geochemistry, along with ground and high-resolution airborne geophysics to identify new targets for drilling.

In August 2024, China announced antimony export restrictions which take effect on September 15, 2024, and are expected to have significant implications for the global antimony supply chain. Antimony prices have nearly doubled since the start of 2025 to a record $22,750 per tonne.

Hertz Energy has granted an aggregate of 1,100,000 stock options to directors, officers, employees and consultants of the Company. The options are exercisable for a period of 3 years from the date of grant at the price of $0.32 per share.

Hertz Energy Inc. is a British Columbia based junior exploration company primarily engaged in the acquisition and exploration of energy metals mineral properties. The Company’s lithium exploration projects include the AC/DC and Agastya Lithium Projects in James Bay Québec.

Contact:
Kal Malhi
Chief Executive Officer and Director
Phone: 604-805-4602
Email: kal@bullruncapital.ca

Source: Hertz Energy Inc.

×

Welcome!

Smallcap Reporter is the source most up-to-date real-time, direct-from-source News Tips and Story Leads.

By Subscribing you will receive Daily Smallcap Update each day at 9:30 am ET (Market Open) in your inbox and you can unsubscribe any time.