Golden Arrow (TSXV:GRG) Confirms Gold Zone at San Pietro Project with Trench Results

VANCOUVER, BC — January 12, 2026 — Leads & Copy — Golden Arrow Resources Corporation (TSXV: GRG) (FSE: G6A) (OTCQB: GARWF) has announced the results of its recent trenching program at the Noemi target within the San Pietro IOCG Project in Chile, confirming a structurally-hosted gold system. The trenching, conducted across two areas spanning over three kilometers, revealed significant gold intervals in nearly all of the twenty trenches.

Highlights from the program include:

Trenches 11 through 16, which cover 380 meters of strike and up to 76.7 meters in width at the southern end of the main breccia vein system in the south zone, all showed intervals exceeding 1 g/t Au over 10 meters. Key results include 38.7 meters at 1.44 g/t Au (including 22.5 meters at 2.24 g/t Au in Trench 16), 73.4 meters at 0.87 g/t Au (including 20.2 meters at 2.09 g/t Au in Trench 15), and 76.7 meters at 1.01 g/t Au (including 26.6 meters at 1.65 g/t Au in Trench 14).

Other significant intervals were 32.9 meters at 0.91 g/t Au (including 20.2 meters at 1.10 g/t Au in Trench 13), 34.7 meters at 1.10 g/t Au and 23.9 meters at 0.21 g/t Au (Trench 12), and 92.2 meters at 0.30 g/t Au (including 12.4 meters at 1.07 g/t Au in Trench 11).

The gold system remains open for expansion, with many trenches showing mineralization at their east or west extents, suggesting potential for continued mineralization. The main breccia vein system in the south zone stretches approximately one kilometer and is believed to extend further under cover to the north and south. An historic pit (Florencia Mine) located between the north and south trench zones indicates potential gold recovery from a similar structure.

Brian McEwen, VP Exploration and Development for Golden Arrow, commented that the Noemi gold target’s potential continues to grow and represents a very interesting opportunity. He highlighted the impressive widths and strike length, with mineralization starting at the surface. According to McEwen, mineralized widths may be greater than reported. The company plans a drill program at Noemi as part of the next phase of drilling at San Pietro.

The Noemi target area spans approximately 2 kilometers by 3 kilometers, located about 7 kilometers south of the Rincones copper-gold-iron-cobalt resource area. The area features andesites, tuffs, and volcaniclastic rocks intruded by a micro-diorite, with similarities to Rincones, indicating prospectivity for similar mineralization. An earlier stage alteration assemblage associated with a north-south structural system characterizes a significant gold target within Noemi. This system, identified over an area of approximately 1 kilometer by 750 meters, has shown intervals of up to 10.0 meters averaging 1.88 g/t Au. Subsequent exploration extended the system over two kilometers to the north.

Additional gold-hosting structures have been identified in other locations within the San Pietro property, including the Lolita Norte, Cerro Sur, and Dos Marias targets. Lolita Norte, located three kilometers west of Noemi, features a similar structure mapped for over 1.9 kilometers. The field team has broadened the surface and channel sampling program to include the Cerro Sur and Dos Marias gold targets. Results from the sampling program will be reported in future releases.

The recent trenching program at Noemi included 11 trenches testing the one-kilometer-long mineralized breccia vein system (Paula), six trenches testing a smaller parallel structure (Paula West), and three trenches testing a similar zone to the north (Paula North). The program involved opening twenty trenches, totaling 1,380 meters in length, and collecting 803 samples. Higher gold values correlate with tourmaline in areas of stronger brecciation and replacement.

Rock chip samples were collected by the technical team. Trenches were opened with an excavator to a maximum depth of 2 meters. Channel samples were collected at the bottom of the south wall of the trench, horizontally, with hammer and chisel. Silicified (hard) material was cut with an electrical saw. In all cases the sampling followed a channel. The average length of the samples was 1.7 metres and ranged between 0.4 and 2.6 metres. Samples were shipped to ALS Laboratory in Copiapó, Chile by a contract truck service. The Company follows industry standard procedures for the work carried out on the San Pietro Project, with a quality assurance/quality control (“QA/QC”) program.

Brian McEwen, P.Geol., VP Exploration and Development, is the Qualified Person as defined in National Instrument 43-101 and has reviewed and approved the contents of the news release.

The San Pietro Project targets the discovery of multiple copper-gold-iron oxide (“IOCG”) plus cobalt deposits on over 21,000 hectares located approximately 100 kilometres north of Copiapó in the Atacama Region of Chile.

Golden Arrow operates San Pietro through its 75%-owned Chilean subsidiary, New Golden Explorations Inc. (“NGE”).

Mr. Nikolaos Cacos is President and CEO.

Brian McEwen, VP Exploration and Development

Source: Golden Arrow Resources Corporation

×

Welcome!

Smallcap Reporter is the source most up-to-date real-time, direct-from-source News Tips and Story Leads.

By Subscribing you will receive Daily Smallcap Update each day at 9:30 am ET (Market Open) in your inbox and you can unsubscribe any time.